Vertical Axis Wind Turbine Generator Using Permanent Magnets / Rizvirg P. Barron, and Carlo R. Valdez
Material type: TextPublisher: Rosario, Cavite : Cavite State University-CCAT Campus, 2018Description: xiii, 53 leaves : illustrations ; 28 cmSubject(s): Wind power | Wind turbines -- Design and construction | Electric power distributionLOC classification: UM TJ 820 | V35 2018Summary: VALDEZ, CARLO R., BARRON, RIZVIRG P. Vertical Axis Wind Turbine Generator Using Permanent Magnets. Design Project. Department of Engineering. Cavite State University-Cavite College of Arts and Trades Campus. Rosario, Cavite. June 2018. Adviser: Engr. Orlando P. Soberano. Technical critic: Nemrod M. Zoleta The study was conducted from January 2017 to April 2018 to design. construct. and test the vertical axis wind turbine generator that uses permanent magnet . Specifically, the study aims to design and construct a vertical axis wind turbine power generator using permanent magnet; evaluate the device according to required wind speed to run the propeller and meet the required voltage to charge the battery, time it takes to charge the battery, and the time of the battery to be discharge when the street light is working while charging; and lastly, to conduct a cost analysis. Every 5 hours is the interval time conducted to monitor the charging time of the battery. The monitoring started from April 23, 2018 to April 28, 2018, from 8 am to 6 pm. For a total of 58 hours of charging time, the battery reached 12.67 V terminal voltage of electricity. The required wind speed and angular velocity is 3.6 m/sec and 373 RPM to initially move the propeller and a constant or higher value for 4 sec to reach the required speed to produce 12v minimum voltage required for the battery to charge. The street light was monitored with an LDR circuit that started to supply the 8 watts LED bulb every 6:27 pm to 5:35 am in the morning for a total running time of 11 hours and 8 minutes. The results of the statistical analysis of data revealed that the time it took to charge the battery with 5 hours monitoring time interval to charge 12.67 V with a terminal voltage of 58 hours; and for a total of 23 hours of running time of the load, the battery was discharged to 11.74 V terminal voltage.Item type | Current location | Collection | Shelving location | Call number | Copy number | Status | Date due | Barcode |
---|---|---|---|---|---|---|---|---|
Thesis/Manuscripts/Dissertations | Cavite State University - CCAT Campus | Thesis/Manuscript/Dissertation | TH | UM TJ 820 V35 2018 (Browse shelf) | 1 copy | Available | T0004240 |
Browsing Cavite State University - CCAT Campus shelves, Shelving location: TH, Collection: Thesis/Manuscript/Dissertation Close shelf browser
UM TJ 808 O73 2018 Road Ramp Power Generator as Alternative Energy Source / | UM TJ 808 T84 2019 Merry-Go-Round Electricity Generator for Battery Charging Application / | UM TJ 810 A37 2019 Development of Portable Paint Sprayer with Solar Power / | UM TJ 820 V35 2018 Vertical Axis Wind Turbine Generator Using Permanent Magnets / | UM TJ 828 B47 2019 Performance Analysis of Diffuser-Augmented Wind Turbine System / | UM TJ 828 J83 2018 Innovative Blade Indentation Energy Generation System for Households / | UM TJ 950 A73 2018 Development of a pneumatic sheet metal cutting machine / |
Project Design (BSEE)--Cavite State University-CCAT Campus, 2018.
Includes bibliographical references and appendices.
VALDEZ, CARLO R., BARRON, RIZVIRG P. Vertical Axis Wind Turbine Generator Using Permanent Magnets. Design Project. Department of Engineering. Cavite State University-Cavite College of Arts and Trades Campus. Rosario, Cavite. June 2018. Adviser: Engr. Orlando P. Soberano. Technical critic: Nemrod M. Zoleta
The study was conducted from January 2017 to April 2018 to design. construct. and test the vertical axis wind turbine generator that uses permanent magnet . Specifically, the study aims to design and construct a vertical axis wind turbine power generator using permanent magnet; evaluate the device according to required wind speed to run the propeller and meet the required voltage to charge the battery, time it takes to charge the battery, and the time of the battery to be discharge when the street light is working while charging; and lastly, to conduct a cost analysis.
Every 5 hours is the interval time conducted to monitor the charging time of the battery. The monitoring started from April 23, 2018 to April 28, 2018, from 8 am to 6 pm. For a total of 58 hours of charging time, the battery reached 12.67 V terminal voltage of electricity. The required wind speed and angular velocity is 3.6 m/sec and 373 RPM to initially move the propeller and a constant or higher value for 4 sec to reach the required speed to produce 12v minimum voltage required for the battery to charge. The street light was monitored with an LDR circuit that started to supply the 8 watts LED bulb every
6:27 pm to 5:35 am in the morning for a total running time of 11 hours and 8 minutes.
The results of the statistical analysis of data revealed that the time it took to charge the battery with 5 hours monitoring time interval to charge 12.67 V with a terminal voltage of 58 hours; and for a total of 23 hours of running time of the load, the
battery was discharged to 11.74 V terminal voltage.