Cover image

Development of automated scheduling system / Gielaine A. Vargas [and three others].

Contributor(s): Tamio, Emm Jeigh M., author | Crisostomo, Esmee C., author | Bautista, Rose Ann A., author | Estonilo, Christopher G., adviser | Arguson, Angelo C., authorMaterial type: TextTextPublisher: Rosario, Cavite : Cavite State University-CCAT Campus, 2012Description: ii, 25 leaves : illustrations ; 28 cmSubject(s): Schedules, School -- Data processing | Electronic data processing | Schedules, School -- Data processing -- Cavite State University - Rosario CampusLOC classification: UM LD 6241.7 | D48 2012Summary: The study was conducted to develop a software version of Manual Scheduling System The software provides the functionality of having an Automated Scheduling System through Microsoft Visual Basic and MySQL database The system is developed to innovate the manual way of making schedules We all know that in very difficult management of scheduling, they need a system that prevents making common mistakes and has scheduling tasks that is fast and reliable. The old time made it by hand but today it is suitable for automation Prototyping Development Approach Methodology was used in the development of the scheduling software that includes Planning, Analysis, Design, Architectural Design, Prototype Analysis and Design, Prototype Construction and Prototype Testing and Evaluation Software used in the study was the following Windows XP, which was used as operating system, and Microsoft Visual Basic 60 as the programming language and MySQL as the database. The software was evaluated based on the given criteria Functionality, Content, Reliability, Availability, Maintainability, Salability Evaluators were composed of College Students, Faculty members and professionals The software passed all the given criteria in the evaluation and met all these requirements of the software The specific objective of the study will meet.
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Shelving location Call number Copy number Status Date due Barcode
Thesis/Manuscripts/Dissertations Thesis/Manuscripts/Dissertations Cavite State University - CCAT Campus
Thesis/Manuscript/Dissertation TH UM LD 6241.7 D48 2012 (Browse shelf) 1 Available T0000635
Browsing Cavite State University - CCAT Campus shelves, Shelving location: TH, Collection: Thesis/Manuscript/Dissertation Close shelf browser

Undergraduate Thesis (BSCpE) (BSInfoTech)--Cavite State University-CCAT Campus, 2012.

Includes bibliographical references and appendices.

The study was conducted to develop a software version of Manual Scheduling System The software provides the functionality of having an Automated Scheduling System through Microsoft Visual Basic and MySQL database The system is developed to innovate the manual way of making schedules We all know that in very difficult management of scheduling, they need a system that prevents making common mistakes and has scheduling tasks that is fast and reliable. The old time made it by hand but today it is suitable for

automation

Prototyping Development Approach Methodology was used in the development of the scheduling software that includes Planning, Analysis, Design, Architectural Design, Prototype Analysis and Design, Prototype Construction and Prototype Testing and Evaluation Software used in the study was the following Windows XP, which was used as operating system, and Microsoft Visual Basic 60 as the programming language and MySQL as the database.

The software was evaluated based on the given criteria Functionality, Content, Reliability, Availability, Maintainability, Salability Evaluators were composed of College Students, Faculty members and professionals The software passed all the given criteria in the evaluation and met all these requirements of the software The specific objective of the study will meet.

In English text.

There are no comments on this title.

to post a comment.

Powered by Koha