000 | 02535nam a22002657a 4500 | ||
---|---|---|---|
003 | OSt | ||
005 | 20220615005026.0 | ||
008 | 220420b ||||| |||| 00| 0 eng d | ||
040 |
_bEnglish. _cCvSU-CCAT Campus Library. _erda. |
||
050 |
_aUM TK 2551 _bL84 2017 |
||
100 |
_aLugnasin, Dondon E., author _94805 |
||
245 |
_aDevelopment of Three-Phase Transformer Trainer / _cDondon E. Lugnasin |
||
260 |
_aRosario, Cavite : _bCavite State University-CCAT Campus, _c2017 |
||
300 |
_aix, 53 leaves : _billustrations ; _c28 cm |
||
500 | _aProject Design (BSEE)--Cavite State University-CCAT Campus, 2017. | ||
504 | _aIncludes bibliographical references and appendices. | ||
520 | _aLUGNASIN, DONDON E. Development of Three-Phase Transformer Trainer. Design Project. Bachelor of Science in Electrical Engineering. Cavite State University Rosario, Rosario, Cavite. April 2017. Adviser: Engr. Harvey T. Crisostomo. Technical Critic: Mr. Jurick P. Paulino. The study was conducted from August 2017 until December 2017 to design and construct a three-phase transformer training board. Specifically, it aimed to: 1. design and construct a three-phase transformer training board; 2. provide a model that can simulate a three-phase connections; and 3. compare results of tests with the transformer trainer's measuring module with the calculated value and the reading of other device. The project is focused on the development of three-phase transformer trainer. It is an instructional material that will enable users learn on-hand theoretical concepts on three-phase transformers. It undergone several stages of research and development process from the conceptualization, construction and testing to the final troubleshooting of the device. The project successfully demonstrated the three-phase transformer connections. The project accessibility obtained, yet it was concluded that as recommendation, usage of an instrument that is designed to measure three phase power that could display minimal value of voltage and currents and adding sets of balance loads to maximize the number of possible connections would further improve the project functionality and accuracy. | ||
650 |
_aElectric transformers _xDesign and construction. _94806 |
||
650 |
_aPhase transformers. _94807 |
||
650 |
_aThree-phase transformers. _94808 |
||
700 |
_aCrisostomo, Harvey T., adviser _94809 |
||
700 |
_aPaulino, Jurick P., critic _94705 |
||
942 |
_2lcc _cT/M/D _hTK 2551 _iL84 2017 _kUM |
||
999 |
_c1603 _d1603 |