Cover image

Three-phase generator synchronizing trainer / John Michael L. Legacion, [and three others]

Contributor(s): Legacion, John Michael L., author | Niviar, Marvin V., author | Nual, Christopher B., author | Tito, Lorraine A., author | Castro, Alvin A., adviser | Legaspi, Noelle T., criticMaterial type: TextTextPublisher: Rosario, Cavite : Cavite State University-CCAT Campus, 2019Description: xv, 50 leaves : illustrations ; 28 cmSubject(s): Electric generator -- Alternating current | Electric generator -- Design and construction | Synchronous generator | Electric wiringLOC classification: UM TK 2761 | L44 2019Summary: LEGACION, JOHN MICHAEL L., NIVIAR, MARVIN V., NUAL, CRISTOPHER R, TITO, LORRAINE A. Three-phase generator synchronizing trainer. Undergraduate Design Project. Bachelor of Science in Electrical Engineering. Cavite State University - Cavite College of Arts and Trades Campus, Rosario, Cavite. June 2019. Adviser: Engr. Alvin A Castro. Technical Critic: Prof. Noelle T. Legaspi. The study was conducted from August 2018 to March 2019 to develop a three ­phase generator to grid synchronizing trainer Specifically this study aims to: 1. design and construct a trainer for synchronizing AC generator. lt focuses on synchronizing two alternators where an alternator will connect in parallel to the other alternator that is in live system of constant voltage and constant frequency. 2. test and evaluate the proposed trainer in terms of its functionality, construction, effectiveness, reliability and safety. Lastly, assess the trainer to comply with the electrical standards. The trainer was constructed with individual digital meters that are used to test alternators like short circuit test, open circuit test and de resistance test. Digital multi-meters were constructed to check the voltage magnitude and frequency of the incoming generator and bus generator. The system uses synchroscope to check the voltage difference, frequency difference, phase sequence and phase angle between the incoming generator and bus generator. A synchronizing switch is use to switch on or make contact between alternators and grid source when it completely meets the condition of synchronizing. The results of the evaluation revealed that the three-phase generator synchronizing trainer is feasible and reliable.
List(s) this item appears in: List of Unpublished Materials (BSEE)
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Collection Shelving location Call number Copy number Status Date due Barcode
Thesis/Manuscripts/Dissertations Thesis/Manuscripts/Dissertations Cavite State University - CCAT Campus
Thesis/Manuscript/Dissertation TH UM TK 2761 L44 2019 (Browse shelf) 1 copy Available T0005053

Undergraduate Project Design (BSEE)--Cavite State University-CCAT Campus, 2019.

Includes bibliographical references and appendices.

LEGACION, JOHN MICHAEL L., NIVIAR, MARVIN V., NUAL, CRISTOPHER R, TITO, LORRAINE A. Three-phase generator synchronizing trainer. Undergraduate Design Project. Bachelor of Science in Electrical Engineering. Cavite State University - Cavite College of Arts and Trades Campus, Rosario, Cavite. June 2019. Adviser: Engr. Alvin A Castro. Technical Critic: Prof. Noelle T. Legaspi.

The study was conducted from August 2018 to March 2019 to develop a three ­phase generator to grid synchronizing trainer Specifically this study aims to: 1. design and construct a trainer for synchronizing AC generator. lt focuses on synchronizing two alternators where an alternator will connect in parallel to the other alternator that is in live system of constant voltage and constant frequency. 2. test and evaluate the proposed trainer in terms of its functionality, construction, effectiveness, reliability and safety. Lastly, assess the trainer to comply with the electrical standards. The trainer was constructed with individual digital meters that are used to test alternators like short circuit test, open circuit test and de resistance test. Digital multi-meters were constructed to check the voltage magnitude and frequency of the incoming generator and bus generator. The system uses synchroscope to check the voltage difference, frequency difference, phase sequence and phase angle between the incoming generator and bus generator. A synchronizing switch is use to switch on or make contact between alternators and grid source when it completely meets the condition of synchronizing. The results of the evaluation revealed that the three-phase generator synchronizing trainer is feasible and reliable.

There are no comments on this title.

to post a comment.

Powered by Koha